Installed the sill plate

  • Precision Construction located in the greater Los Angeles area working on a new room addition. We have installed the sill plate (2×6 as per plan), and bolted everything down to the anchor bolts. We are installing the 2×6 floor joist as per plan. We have Miguel taking care of the situation. Next will be the floor joist and insulation.