Instaling The Sealing Joist And Blocking

  • Precision Construction working on a 350 square foot room addition in Los Angeles California. We just installed the sealing joist and blocking. There is compression-blocking traveling down the center. The roof rafters are currently going up and the ridge has been installed. The stucco had to be removed, and replaced with a couple of sheer walls. All the stucco had to be removed from the side of the house and will be replaced with sheer walls.
  • Call us at (310)-497-5438 for all your room addition and renovation needs.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>